Slibsilo’s Peruweld

2 silos de stockage 175 m3 - Station depuration de Roselies
Construction site
Roselies - Belgium
Year of construction
2005
Dimensions
Supporting structure (2x)
Total length: 4.2 m
Width: 3.2 m
Height: 2.7 m
Weight: ± 12 ton steel
Software
Engineering: Esa Prima Win
Design: Tekla Structures
Mission
Engineering
General drawings
Shop drawings



