Combined Cycle Power Station


Phase 2 & 3 Combined Cycle Power Station

Construction site

Termorio - Brazil

Year of construction

2002

Dimensions

Total length: 25 m
Width: 14 m
Height: 23.5 m
Weight: ± 202 ton steel

Software

Engineering: Esa Prima Win
Design: X-Steel

Mission

Engineering
Detailed drawings
General drawings
Shop drawings
Assembly drawings


boven